Project Portfolio
Eco Transfer Facility
Duration – 12 months
Client – Eco-Energy (Fueling Solutions)
Category – General Construction
PROJECT OVERVIEW
The JPC Group Inc. in the prime contractor on Eco Energy Ethanol Transfer Facility, valued at $26 million dollars. The project included the construction of a 80 tanker car rail yard, two-2.5 million gallon field fabricated ethanol storage tanks, offloading and loading pump stations, a two bay tanker truck ethanol loading terminal and ethanol lines out to Pier 124 for ethanol loading onto barges. This facility has the capability of loading 150 million gallons per year into tanker truck or barges for delivery to the various local refineries.